K-18 ITS Project
Description
This project will install various ITS components along K–18 from the K–18/K–113 Interchange to the K–18/I–70 Interchange. Project components include installation of speed and count stations, permanent dynamic message signs, and fiber optic cable. In addition, a fiber optic cable will need to be installed from K–18/K–113 Interchange to the Manhattan Traffic Operations Facility.
Status: Identified as Need
Timeframe: Medium Term to Long Term
Stakeholders
| City of Manhattan Public Works |
|---|
| Fort Riley |
|---|
| Kansas DOT |
|---|
| Kansas Highway Patrol |
|---|
| Kansas State University |
|---|
| Riley County |
|---|
Inventory
| Manhattan Communications Network |
|---|
| Manhattan Dynamic Message Signs |
|---|
| Manhattan Traffic Detection Equipment |
|---|
| Manhattan Traffic Operations Facility |
|---|
Services
| TM01–Infrastructure–Based Traffic Surveillance |
|---|
| TM06–Traffic Information Dissemination |
|---|
Interfaces
| Source | Flow | Destination | Status |
|---|
| Manhattan Dynamic Message Signs | roadway dynamic signage status | Manhattan Traffic Operations Facility | Identified as Need |
|---|
| Manhattan Traffic Detection Equipment | traffic detector data | Manhattan Traffic Operations Facility | Identified as Need |
|---|
| Manhattan Traffic Operations Facility | roadway dynamic signage data | Manhattan Dynamic Message Signs | Identified as Need |
|---|
| Manhattan Traffic Operations Facility | traffic detector control | Manhattan Traffic Detection Equipment | Identified as Need |
|---|