Kimball Avenue Coordination Project

Description

This project will encompass bringing online 5 intersections along the Kimball Avenue corridor, as well as 4 additional PTZ cameras. This project will require the installation of fiber optic cable throughout the corridor. This corridor receives all K–State athletic event traffic to and from the stadiums, as well as traffic that will be generated during and after the completion of the National Bio and Agro–Defense Facility (NBAF).

Status

Active

Timeframe

Short Term

Stakeholders

City of Manhattan Public Works
Kansas Homeland Security
Kansas State University

Inventory

Manhattan CCTV Cameras
Manhattan Communications Network
Manhattan Traffic Operations Facility
Manhattan Traffic Signals

Services

TM01–Infrastructure–Based Traffic Surveillance
TM03–Traffic Signal Control

Interfaces

SourceFlowDestinationStatus
Manhattan CCTV Camerastraffic imagesManhattan Traffic Operations FacilityActive
Manhattan Traffic Operations Facilitysignal control commandsManhattan Traffic SignalsActive
Manhattan Traffic Operations Facilitysignal control device configurationManhattan Traffic SignalsActive
Manhattan Traffic Operations Facilitysignal control plansManhattan Traffic SignalsActive
Manhattan Traffic Operations Facilitysignal system configurationManhattan Traffic SignalsActive
Manhattan Traffic Operations Facilityvideo surveillance controlManhattan CCTV CamerasActive
Manhattan Traffic Signalsright–of–way request notificationManhattan Traffic Operations FacilityActive
Manhattan Traffic Signalssignal control statusManhattan Traffic Operations FacilityActive
Manhattan Traffic Signalssignal fault dataManhattan Traffic Operations FacilityActive