K-18 ITS Project
Description
This project will install various ITS components along K–18 from the K–18/K–113 Interchange to the K–18/I–70 Interchange. Project components include installation of speed and count stations, permanent dynamic message signs, and fiber optic cable. In addition, a fiber optic cable will need to be installed from K–18/K–113 Interchange to the Manhattan Traffic Operations Facility.
Status
Identified as Need
Timeframe
Medium Term to Long Term
Stakeholders
City of Manhattan Public Works |
---|
Fort Riley |
---|
Kansas DOT |
---|
Kansas Highway Patrol |
---|
Kansas State University |
---|
Riley County |
---|
Inventory
Manhattan Communications Network |
---|
Manhattan Dynamic Message Signs |
---|
Manhattan Traffic Detection Equipment |
---|
Manhattan Traffic Operations Facility |
---|
Services
TM01–Infrastructure–Based Traffic Surveillance |
---|
TM06–Traffic Information Dissemination |
---|
Interfaces
Source | Flow | Destination | Status |
---|
Manhattan Dynamic Message Signs | roadway dynamic signage status | Manhattan Traffic Operations Facility | Identified as Need |
---|
Manhattan Traffic Detection Equipment | traffic detector data | Manhattan Traffic Operations Facility | Identified as Need |
---|
Manhattan Traffic Operations Facility | roadway dynamic signage data | Manhattan Dynamic Message Signs | Identified as Need |
---|
Manhattan Traffic Operations Facility | traffic detector control | Manhattan Traffic Detection Equipment | Identified as Need |
---|