North Tuttle Creek Boulevard (US-24) Coordination Project

Description

This project will allow connections to 6 additional traffic signals along US–24 from East Poyntz North to Kimball Avenue. This project will also install 2 to 3 additional PTZ cameras. In addition, this project will install a fiber optic network for parts or all of the project area, or a hybrid fiber and wireless bridging link for other parts of the project.

Status

Active

Timeframe

Short Term

Stakeholders

City of Manhattan Public Works

Inventory

Manhattan CCTV Cameras
Manhattan Communications Network
Manhattan Traffic Operations Facility
Manhattan Traffic Signals

Services

TM01–Infrastructure–Based Traffic Surveillance
TM03–Traffic Signal Control

Interfaces

SourceFlowDestinationStatus
Manhattan CCTV Camerasfield equipment statusManhattan Traffic Operations FacilityActive
Manhattan CCTV Camerastraffic imagesManhattan Traffic Operations FacilityActive
Manhattan Traffic Operations Facilitysignal control commandsManhattan Traffic SignalsActive
Manhattan Traffic Operations Facilitysignal control device configurationManhattan Traffic SignalsActive
Manhattan Traffic Operations Facilitysignal control plansManhattan Traffic SignalsActive
Manhattan Traffic Operations Facilitysignal system configurationManhattan Traffic SignalsActive
Manhattan Traffic Operations Facilityvideo surveillance controlManhattan CCTV CamerasActive
Manhattan Traffic Signalsright–of–way request notificationManhattan Traffic Operations FacilityActive
Manhattan Traffic Signalssignal control statusManhattan Traffic Operations FacilityActive
Manhattan Traffic Signalssignal fault dataManhattan Traffic Operations FacilityActive