North Tuttle Creek Boulevard (US-24) Coordination Project
Description
This project will allow connections to 6 additional traffic signals along US–24 from East Poyntz North to Kimball Avenue. This project will also install 2 to 3 additional PTZ cameras. In addition, this project will install a fiber optic network for parts or all of the project area, or a hybrid fiber and wireless bridging link for other parts of the project.
Status
Active
Timeframe
Short Term
Stakeholders
City of Manhattan Public Works |
---|
Inventory
Manhattan CCTV Cameras |
---|
Manhattan Communications Network |
---|
Manhattan Traffic Operations Facility |
---|
Manhattan Traffic Signals |
---|
Services
TM01–Infrastructure–Based Traffic Surveillance |
---|
TM03–Traffic Signal Control |
---|
Interfaces
Source | Flow | Destination | Status |
---|
Manhattan CCTV Cameras | field equipment status | Manhattan Traffic Operations Facility | Active |
---|
Manhattan CCTV Cameras | traffic images | Manhattan Traffic Operations Facility | Active |
---|
Manhattan Traffic Operations Facility | signal control commands | Manhattan Traffic Signals | Active |
---|
Manhattan Traffic Operations Facility | signal control device configuration | Manhattan Traffic Signals | Active |
---|
Manhattan Traffic Operations Facility | signal control plans | Manhattan Traffic Signals | Active |
---|
Manhattan Traffic Operations Facility | signal system configuration | Manhattan Traffic Signals | Active |
---|
Manhattan Traffic Operations Facility | video surveillance control | Manhattan CCTV Cameras | Active |
---|
Manhattan Traffic Signals | right–of–way request notification | Manhattan Traffic Operations Facility | Active |
---|
Manhattan Traffic Signals | signal control status | Manhattan Traffic Operations Facility | Active |
---|
Manhattan Traffic Signals | signal fault data | Manhattan Traffic Operations Facility | Active |
---|